BIMM Birmingham Phase 1

BIMM Birmingham where designed and constructed their Phase 2 studio comprising an Audient Control Room, Live Room and Iso Lobby. Additionally we installed a Mac Lab and revamped the corridor area ready for Phase 3 the following year. The build was carried out during the Summer recess and included a full Technical Install based around the Audient ASP8024 which included our custom furniture designed to complement this busy teaching facility. The monitoring system is 5.1 using Genelec active speakers. Completion was October 2018 followed by Phase 3 in 2019.