Frontier post - 2

Complete refurbishment and design/construction of 4 new Video Edit Suites, large Machine Room, Reception and Archiving section for Frontier Post Ltd in Wells Street, London. Works were phased over 3 months to allow continued operation of the facility and tied in with a full technical wiring installation by GAS. Completion August 2004.

Edit 1 Avid is HDTV equipped with 5.1 support in-place.
All doors, trim and technical furniture is in English Oak and 8 A/C systems formed part of our M&E install.
Edit 2 on the 1st Floor
Stainless steel/Oak Reception desk on GF
Ground Floor Office and Reception area
AutoCad layout plan for the 1st Floor